综合管廊建设通常是如下
综合管廊模具的使用,将管线集约化的容纳在综合管廊中,不但美化了环境,也避免了由于埋设或维修管线而导致路面重复开挖的麻烦。
The use of the utility tunnel mold can intensively accommodate the pipelines in the utility tunnel, which not only beautifies the environment, but also avoids the trouble of repeated excavation of the pavement caused by the embedding or maintenance of pipelines.
目前综合管廊建设通常是如下两种方式:一是现场现浇,二是工厂预制;现场现浇式地下管廊的所有工作均在现场完成,所以侧墙及顶板均要配置模板,不仅造成大量模板的浪费,同时施工周期长,为保证施工的操作空间,土方开挖量大,回填量也较大
At present, the construction of comprehensive pipe gallery is usually carried out in the following two ways: one is cast-in-situ, the other is factory prefabrication; all the work of cast-in-place underground pipe gallery is completed on site, so the side wall and roof should be equipped with formwork, which not only causes a lot of waste of formwork, but also has a long construction period. In order to ensure the operation space of construction, the volume of earthwork excavation is large and the amount of backfill is also large